CMA CGM MOLIERE Vessel Schedule
Upcoming port calls, recent port calls and routes of CMA CGM MOLIERE, measured from containers tracked on ShipsGo.
Vessel Particulars
- IMO number
- 9401099
- MMSI
- 249917000
- Call sign
- 9HA2072
- Flag
Malta- Vessel type
- Container Ship
- Size class
- Post Panamax
- Year built
- 2009
- Capacity
- 6,570 TEU
- Deadweight
- 83,293 t
- Gross tonnage
- 72,884
- Length x beam
- 300 m x 40 m
About CMA CGM MOLIERE
CMA CGM MOLIERE (IMO 9401099) is a container ship built in 2009, flying the flag of Malta. It is 300 m long and 40 m wide, with a capacity of 6,570 TEU.
In the last six months, containers of CMA CGM, OOCL and ONE tracked on ShipsGo sailed on CMA CGM MOLIERE. The busiest route was Antwerp to Veracruz, 20 days on average.
CMA CGM MOLIERE Upcoming Port Calls
Next port calls of CMA CGM MOLIERE, estimated from the dates carriers report for containers on board that are tracked on ShipsGo, as of 21 October 2026. Estimates can change.
| Port | Estimated date | Voyage |
|---|---|---|
| 24 Oct 2026Sat | 0VBNKE1MA | |
| 27 Oct 2026Tue | 0VBNKE1MA | |
| 28 Oct 2026Wed | 0VBNKE1MA, VIC0E0W19 | |
| 1 Nov 2026Sun | VIC0E0W19 | |
| 2 Nov 2026Mon | 0VBNKE1MA, VIC0E0W19 | |
| 20 Nov 2026Fri | VIC0E0W19 | |
| 23 Nov 2026Mon | VIC0E0W19 | |
| 27 Nov 2026Fri | VIC0E0W19 | |
| 1 Dec 2026Tue | VIC0E0W19 |
CMA CGM MOLIERE Recent Port Calls
Ports where CMA CGM MOLIERE loaded or discharged containers tracked on ShipsGo in the last 60 days, most recent first.
| Port | Cargo operations | Voyage |
|---|---|---|
| 7 Oct 2026 | 0VBNKE1MA | |
| 2 to 3 Oct 2026 | 0VBNJW1MA, 0VBNKE1MA | |
| 30 Sep 2026 | 0VBNJW1MA, 0VBNKE1MA | |
| 28 Sep 2026 | 0VBNJW1MA | |
| 11 to 13 Sep 2026 | 0VBNJW1MA, 0VBN2E1MA | |
| 9 to 10 Sep 2026 | 0VBNJW1MA, 0VBN2E1MA | |
| 3 to 4 Sep 2026 | 0VBNJW1MA, 0VBN2E1MA | |
| 30 to 31 Aug 2026 | 0VBNJW1MA, 0VBN2E1MA |
Routes Sailed by CMA CGM MOLIERE
Routes of the containers carried on CMA CGM MOLIERE and tracked on ShipsGo in the last six months. Transit time runs from loading at the origin to discharge at the destination, including any transshipment.
| Route | Avg. transit | Share | Carriers | Compare |
|---|---|---|---|---|
| 20 days | 6.5% | CMA CGM, OOCL | Compare carriers | |
| 60 days | 5.8% | CMA CGM | Compare carriers | |
| 16 days | 5.0% | CMA CGM | Compare carriers | |
| 36 days | 5.0% | OOCL | Compare carriers | |
| 92 days | 4.3% | CMA CGM | Compare carriers | |
| 20 days | 4.3% | OOCL, CMA CGM, Evergreen | Compare carriers | |
| 18 days | 3.6% | COSCO Shipping | Compare carriers | |
| 29 days | 3.6% | OOCL, ONE | Compare carriers |
Shipping Lines Using CMA CGM MOLIERE
Carriers whose containers sailed on CMA CGM MOLIERE in the last six months, by share of containers tracked on ShipsGo.
Compare every carrier on your route
A free account shows every service on your route with real transit times, schedule reliability, recent sailings, CO2 per service and the forwarders working that lane.
CMA CGM MOLIERE FAQ
CMA CGM MOLIERE has the IMO number 9401099. Its MMSI is 249917000 and its call sign is 9HA2072. It is a container ship built in 2009, flying the flag of Malta.
According to containers tracked on ShipsGo, CMA CGM MOLIERE last worked cargo at New Orleans on 7 October 2026, and it is next expected at Southampton around 24 October 2026. These are cargo dates reported by the carriers, not a live position, and estimates can change.
Between April 2026 and October 2026, containers of CMA CGM, OOCL and ONE tracked on ShipsGo were carried on CMA CGM MOLIERE.
The routes with the most containers on CMA CGM MOLIERE tracked on ShipsGo were Antwerp to Veracruz, Aliaga (Izmir) to Houston and Bremerhaven to Veracruz.
Enter the container, booking or bill of lading number on ShipsGo. You can follow the vessel, every port event and the ETA, and get alerts when the container sails, arrives or is released.
How These Figures Are Calculated
Port calls come from the loading and discharge dates of containers on CMA CGM MOLIERE that are tracked on ShipsGo; the dates are reported by the carriers and are not a live vessel position. Upcoming calls are the carriers' estimates for those containers. Routes and carriers come from containers that started being tracked between 21 April 2026 and 21 October 2026 and have since been discharged; a route is shown only when enough containers were tracked on it, and volumes are shown as shares rather than counts. Vessel particulars as of 20 October 2026. Figures updated 21 October 2026.




